Pathworks Engineering
Representative engineering workspace with an OSP designer reviewing fiber routes and CAD drawings on dual monitors

Full Service Design.
Delivered Remotely.

Pathworks turns hand sketches, marked-up maps and rough spreadsheets into professional, standards-compliant engineering deliverables across FTTx & Telecom and Energy & Renewables.

FTTx & TelecomNetwork design, HLD/LLD, splicing, permits
Energy & RenewablesSolar, storage, microgrids, power systems
How it works

Full service engineering design. Delivered remotely.

See the full process
  1. 01

    Start with a bounded request

    Send what you have — sketches, GIS/CAD files, pole data, spreadsheets. A named engineer reviews it and confirms a scoping timetable.

  2. 02

    Agree scope, standards & criteria

    Work begins once a written SOW sets deliverables, assumptions, standards and who owns each engineering decision.

  3. 03

    Produce with visible controls

    Assumptions, RFIs and progress are logged as they happen, not buried inside the drawing set.

  4. 04

    Independent QA & handoff

    A second reviewer checks the package against the SOW before a revision-tracked transmittal ships.

Engagement models

Work with us the way that fits your pipeline.

One-off

Per-Project

Fixed scope, fixed price, per task or drawing package. Quoted within 12 hours of your request: ideal for a single design, a permit package, or clearing a specific backlog item.

Recurring

Retainer

Reserved monthly capacity (hours or deliverable volume) with priority turnaround. Built for teams with an ongoing design and drafting pipeline.

Both paths end in a scoped quotation prepared by our team. Pricing is confirmed during scoping, not published up front.

Featured case study

Greenfield FTTH design for 500 homes, full OSP package from plat to BOM

Built to standard US ILEC/CLEC practice: a two-stage 1:4/1:8 split localizes fault response to a single FDT instead of the whole feeder, construction runs underground-first to meet HOA aesthetic requirements, and 20–30% spare fiber is held at every tier so the network can absorb infill lots without a re-trench. The design closes with 7.4 dB of optical margin against the 28 dB GPON Class B+ budget, enough headroom for a future 1:64 upgrade at a subset of FDTs.

Input received
The subdivision plat with lot layout and home count (~4 homes/acre), the target GPON architecture, and local joint-trench and AHJ burial requirements.
Delivered
A complete outside-plant design: two-stage centralized/distributed GPON topology (FDH/FDT), civil route and handhole plan, fiber count and splice architecture by tier, a cumulative optical link budget, and a procurement-ready bill of materials.
Timeline
Scoped in 2 hours, delivered in 2 business days.
Read the full case study
OSP network topology from the Central Office to the home: a real two-stage GPON split design for a 500-home greenfield build
Central Office

144F feeder cable, gel-filled loose tube, 3.6 km run

FDH (curb cabinet)

1:4 splitter: first-stage split, feeds 4 distribution legs

FDT pedestal

1:8 splitter per FDT: 16 FDTs across the subdivision

Home (NID)

1 fiber per home, 500 homes passed, 1:32 effective split

Real client deliverableHover the markers
Remote by design

Time zones aren’t a workaround here. They’re the advantage.

9:00 PM

Your evening: you hand off

9:00 AM

Nairobi morning: we pick up

Overnight turnaround, not overnight delay

Hand off work at the end of your day and find progress waiting when you log back in. Our distributed team spans multiple time zones by design.

One accountable partner, not a patchwork of freelancers

A single delivery team, internally managed and quality-checked, stands behind every deliverable, not a marketplace of disconnected contractors.

Built for global clients from day one

Currencies, units and communication norms anticipate an international client base as standard practice, not an afterthought.

What clients say

Trusted with the details that matter most.

We sent a photo of a whiteboard sketch on a Friday afternoon. By Monday morning we had a scoped quote and a clear delivery date. That turnaround is the whole reason we keep coming back.
Network PlanningRegional ISPName and company withheld under NDA
Our own drafting team was buried in a tender. Pathworks took the overflow electrical packages and handed back drawings we could submit for permit with no rework.
Electrical DesignEPC ContractorName and company withheld under NDA
The time-zone gap stopped being a problem and started being an advantage. We hand off at the end of our day and there's progress waiting when we log back in.
Civil EngineeringInfrastructure ConsultancyName and company withheld under NDA

Have a sketch? That’s enough to start.

Send us anything you have. We’ll reply with a scope and quote within 12 hours.